Deployment status

From PRAGMAgridWIKI

Jump to: navigation, search

The following is a deployment status of the Gfarm version 1.4.1 and the GfarmFS-FUSE 2.0 on each site. You can also check the latest gfsd status here. (Please select Grid:PRAGMA.)


  • AIST (gfmgw10): Done
  • SDSC (rocks-52): Done
  • NECTEC (grid64): Done
  • NCHC (nacona): The GSI authentication-related work is still in progress.
  • NGO (guava): Done
  • U.Tsukuba (bluce): In progress
  • VPAC (sys09): Done
  • CNIC (pragma): Done
  • ThaiGrid (sunyata): Done
  • ASGC (pragma001): Done
  • MIMOS (nucleus): Done
  • GUCAS (gdlab): Done
  • IOIT-HCM (venus): Done
  • LZU (pragma): Done
  • UZH (ocikbpra): Done
  • USM (aurora): In progress
  • CUHK (server1): Done

- Cient tools and library only

  • AIST (xsvc, fsvc001): Done
  • NCSA (tgc): Done

--Tanisuke 21:50, 6 September 2007 (PDT)

Personal tools